Sanction of Sewer/Drain Connection for the Constructed Building

I. Procedure to be followed by the applicant

Procedure to be followed by the applicant and step by step movement of the application within the Department along with timelines for completion of each step is same irrespective of risk category (Low, Medium, High), size of firm ( Micro, Small, Medium & Large), Investor type (Foreign, Domestic), Business location in Municipal Areas.

A. Step by Step Procedure (applicant)

Step 1: Citizen Registration & Citizen Acknowledgement

In order to login to the e-Grihanaksha Portal, the user should do Citizen registration (using an internet browser, type the ‘https://obpsudma.wb.gov.in’ in the address bar and press Enter).
In Citizen registration there are few mandatory fields like, Name, Mobile no., Email ID, preferred User Name, Password, ID proof.
After successful registration, an acknowledgement shall get by citizen. Also citizen shall get his username & password through sms & email notification. If the Citizen has forgotten the password, click ‘Forgot Password’ & reset his/her password.

Step 2: Login to the Application

For login, Citizen should enter his/her ‘User Name’ & ‘Password’ and type the ‘Captcha’ as it appears in the screen then press Login to enter the home page of the application.

Step 3: Apply to Service (CAF initiation)

After login to e-Grihanaksha Portal, the ‘Home Page’ will appear. It shows the comprehensive list of services.
To proceed with the application the user needs to click on ‘Common Application Form’ button.

Step 4: CAF fill-up (Owner details, Site details, Specifications)

The Applicant has to fill-up all information in basic information’s, carefully. If there is any error in entering information the application will be liable for rejection. The Applicant will click to ‘Save / Next’ for further processing.

Step 5: Engagement Technical Personnel

The Applicant will choose technical personnel (LBS/ Architect) from the list of empanelment of technical personnel of the respective ULB according to his/ her/ their own choice.

Step 6: Save the application & Send to consultant

Enter the relevant fields (red asterisks) & citizen can save the file. A unique AIN (Application Identification Number) shall generate.
Citizen can send the file to his/her technical personnel (LBS/ Architect), clicking on “Send to consultant” button.

Step 7: Consultant Login & fill-up all technical parameters mentioned in CAF

For login, technical personnel’s should enter his/her ‘User Name’ & ‘Password’ and type the ‘Captcha’ as it appears in the screen then press Login to enter into the assigned file.
The technical personnel will prepare Sewer/drain line layout drawing.

Step 8: Uploading of Supporting Documents

Attach Supporting Documents for ULB verifications.
Supporting documents can be uploaded by clicking ‘Choose File’ button. After uploading all the mandatory supporting documents, the consultants should save the application.
The consultant can view the application details and supporting document list before final submission of the application and can be corrected if any error is found.

Step 9: File submitted to ULB (Consultant Completed, Nodal officer action pending)

When the file submitted, the application automatically moved to ULB.
Applicant receives sms & email notifications. This contains AIN & application status.

Step 10: Making online payment as per demand note generated

A demand note shall visible in detailed view page containing total amount to be paid. To continue, citizens click on the ‘Pay now’ or click on a ‘link’ (received in email) to make online payment.
There are various payment modes supported by PayU. Some of these payment modes like debit card, net banking are by default available.

Step 11: Application approved

On clicking ‘Signature’ button at the detailed view page a pop-up will appear.
The user will have to click on the ‘Sewer’ icon to get the ‘Approval Certificate’.

B. Comprehensive list of documents to be uploaded

Comprehensive list of documents required for application is same irrespective of risk category (Low, Medium, High), size of firm (Micro, Small, Medium & Large), Investor type (Foreign, Domestic), Business location in Municipal Areas.

  1. Occupancy Certificate.
  2. Mutation Certificate of BLLRO/ Record-of-Rights (Parcha) from BLLRO office for change of ownership.
  3. Up to date paid up Municipal Property Tax receipt of the concerned holding.
  4. Copies of approved final layout drawing of house sewer pipe/drain.
  5. Copy of approved Completion Plan

C. Fee Details

Fees required is same irrespective of risk category (Low, Medium, High), size of firm (Micro, Small, Medium & Large), Investor type (Foreign, Domestic), Business location (Rural, Urban).

https://udma.wb.gov.in/page/cms/sewer_line_connection_fees_a664cc

D. User Manual

  1. Online submission of application along with online submission of documents
  2. Online payment of fee,
  3. Tracking of status of application through the Online system,
  4. Download of the final signed certificate/permission by the ULB from the Online system, and
  5. Online verification of the genuineness of the signed certificate by any third party through the Online system,

is as follows (URL below):
https://udma.wb.gov.in/public/uploads/file_doc/User_Manual_for_Permission_for_Sewerage_Connection.pdf

II. Step by step movement of application within the department along with break-up of timeline

Procedure to be followed by the applicant and step by step movement of the application within the Department along with timelines for completion of each step is the same, irrespective of risk category (Low, Medium, High), size of firm (Micro, Small, Medium & Large), Investor type (Foreign, Domestic), Business location (Rural, Urban).

Official involved Actionable by the Official involved Timeline (days) Sub-total (days)
Nodal Officer Nodal Officer will log in and forward the submitted application to the designated ULB Actors along with remarks. 1 15
Dealing Assistant (DA) DA will login and forward the submitted application to Nodal concerned along with remarks. 5
Engineer (SAE/AE), Sanitation Department Concerned Engineer, Sanitation Department will login and forward the submitted application to Nodal concerned along with remarks after verification of application details and the uploaded documents as required. 4
Nodal Officer Nodal Officer will log in and placed the submitted application to the BOC Meeting. The nodal officer will then approve the file in the system and forward the application to the Applicant end for payment. 1
Signatory Authority (SA)

After payment of the applicant, SA will issue the Drain/Sewer Connection Permit.

The Certificate will be available to the applicant from the system from Applicant’s Dashboard.

4
Total 15